Annual Spring Cleaning for Region’s Water Pipes Begins Monday April 5

March 29, 2021
Filling water glass from faucet

The District of Columbia, Arlington County and northeastern Fairfax County will clean out their tap water network starting Monday—a safe, annual process. Water service continues uninterrupted during the process, which runs from April 5 through May 17. During that time, drinking water may smell or taste slightly different. 

The U.S. Army Corps of Engineers’ Washington Aqueduct, water supplier to these regions, performs the temporary disinfectant switch from chloramine to chlorine to allow local water authorities to clean the pipes and maintain water flow. Washington Aqueduct continues to add a corrosion inhibitor during the process to reduce the potential for release of lead in service lines.

Local water authorities will continually monitor the drinking water for safe chlorine levels as well as conduct system-wide flushing to enhance water quality. At the same time, water utilities will systematically flush fire hydrants by opening them up to allow fresh water to flow through the system. Crews operating hydrants in this manner are a normal part of this routine. This process is repeated nearly every spring, in this region and across the nation.

This temporary cleaning often adds a new smell or taste to tap water. If customers opt, they can run the cold water tap for about two minutes, then use a water filter or allow water to sit in a container in the refrigerator to remove chlorine taste and odor.

Customers who take special precautions to remove chloramine from tap water should continue such methods during the temporary switch to chlorine. As always, those with special concerns should consult their health care provider.

Washington Aqueduct is the wholesale water supplier for the District of Columbia, Arlington and northeastern Fairfax County.

For more information, please contact the appropriate water authority:

  • DC Water: dcwater.com/chlorine-switch; 202-612-3440 (Monday-Friday, 8:00 a.m. - 4:30 p.m.) or 202-612-3400 (24-hour)
  • Arlington County: 703-228-5000 (Monday-Friday, 7:00 a.m. - 7:00 p.m.) or 703-228-6555 (24-hour)
  • Fairfax Water: 703-698-5800 (Monday-Friday, 8:00 a.m. - 6:00 p.m.) or 703-698-5613 (24-hour)

Latest News

Map of Water Street and Capital Crescent Trail

DC CLEAN RIVERS – POTOMAC RIVER TUNNEL PROJECT

Beginning on or about November 12, 2025, DC Water will begin preparing for construction on the Potomac River Tunnel on the 3300 block of Water Street NW, beneath the Whitehurst Freeway.

picture of damage inside the RCMI

Construction Nov 7-10, 14-17; Additional Weekend Closures Will Also Be Necessary 

For the next two weekends, beginning Friday evening and continuing through early Monday, November 7-10 and 14-17, a section of the Rock Creek Multi-use Trail near Rose Park—between P Street NW and Pennsylvania Avenue NW— will be temporarily closed for construction. One sounthbound lane of Rock Creek and Potomac Parkway will also be closed, impacting traffic. This closure is part of ongoing high-priorty repairs to the Rock Creek Main Interceptor (RCMI), a major sewer line which transports more than 100 million gallons of wastewater each day.

Picture of DC Water staff, CEO/GM David Gadis, Mayor Muriel Bowser, DC Water Board Chair Dr. Unique N. Morris-Hughes

Today, DC Water celebrated a major milestone in the Potomac River Tunnel Project with the ceremonial blessing of Mary, the tunnel boring machine (TBM) that will dig the northern leg of the tunnel. The ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Map of Water Street and Capital Crescent Trail
TRAFFIC ADVISORY: Water Street NW at Georgetown Waterfront Park — Travel Lane and Sidewalk Closures

DC CLEAN RIVERS – POTOMAC RIVER TUNNEL PROJECT

Beginning on or about November 12, 2025, DC Water will begin preparing for construction on the Potomac River Tunnel on the 3300 block of Water Street NW, beneath the Whitehurst Freeway.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
November 12, 2025
Wednesday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.