Design and Construction Standards

LINEAR CAD MANUAL 2023

The Linear CAD Manual and it's appendices are now available by clicking the links on this page. 

The Linear CAD Manual (LCM) is the primary computer-aided design (CAD) reference for preparing linear design Drawings in the Capital Improvement Program (CIP) of the District of Columbia Water and Sewer Authority (DC Water). The LCM is referenced as required criteria in the Standard Scope of Work Exhibits of the DC Water Professional Services Agreement. The LCM presents CAD Standards to be used to produce all Design Drawings and Record Drawings for linear infrastructure that are produced by DC Water and its consultants.

If you are working on projects for DC Water, contact Kyle Tyler at kyle.tyler@dcwater.com or Calwood.Somers@dcwater.com to obtain pre-approved CAD templates for design drawings.

For more information regarding other standards, contact Bethel Abate at bethel.abate@dcwater.com

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

West Potomac Park Drive SW
West Potomac Park Drive SW: New Roadway Opening

(Washington, DC) – DC Water will open West Potomac Park Drive SW, a new road constructed as a part of the Potomac River Tunnel (PRT) Project, on Mo

Latest Blog Post
Photo of Great Falls of the Potomac River with fast moving rapids going over the falls
The Critical Need for a More Resilient Water Source and Protecting the One We Have
Source Water Protection Week highlights the case for second water source.