Traffic Advisory: Northeast Boundary Tunnel Shaft Excavation Work to Begin at 4th Street, NE

June 05, 2019

(Washington, DC) – In preparation for construction associated with the DC Water Northeast Boundary Tunnel (NEBT) (dcwater.com/NEBT),  DC Water's contractor will begin staging for shaft excavation activities on 4th Street, NE at the intersection of Rhode Island Avenue, NE. This will require the current work site on 4th Street to be expanded into one lane on Rhode Island Avenue. Subsequently, westbound traffic on Rhode Island Avenue will be reduced from three lanes to two lanes as it moves past the construction site. Once past the intersection at 4th Street, motorists can again utilize three travel lanes. Shaft excavation activities will begin on or about Monday, June 3, 2019.

Work hours will be 7 am to 7 pm, Monday through Friday and will take approximately 1 month to complete. Access to the businesses in the vicinity will remain open during construction activities.

Traffic and Pedestrian Restrictions

Travel Restrictions:

Westbound Rhode Island Avenue, NE - traffic will merge into two-lanes of travel left around the 4th Street, NE construction and then return to three-lane travel immediately past the intersection.

Pedestrian Impacts:

The pedestrian crosswalk across 4th Street, NE at the Rhode Island Avenue, NE intersection will be closed for approximately 1 month. Detour signs will guide pedestrians to safely cross Rhode Island Avenue and the southern intersection of 4th Street.

Safety Information

  • Commuters and pedestrians will notice road signs and/or flagging personnel directing them around the work site. Please obey road crew flaggers and pay attention to signage.
  • As a result of the construction work, commuters may experience congestion within the 250-foot designated work area. Please do not tailgate, keep a safe distance, and don’t drive distracted.
  • Please be patient and stay calm. Plan to allow extra time while traveling around the area. Check real-time traffic apps and the NEBT website for updated traffic impacts.

Additional Information

  • Access to all businesses in the vicinity will remain open during construction activities. Motorists will see flaggers guiding them into the BP Gas Station at the corner of 4th and Rhode Island Avenue, NE if they choose to enter.
  • People who live or work near the affected locations will notice additional construction equipment and personnel as well as noise associated with construction activities.

Project Details

The Northeast Boundary Tunnel is the largest component of the Clean Rivers Project. It begins south of RFK Stadium and will extend north to Rhode Island Avenue, NE and west to 6th Street, NW. When complete, the approximately five-mile long tunnel will significantly reduce chronic flooding in areas it serves.


###

For more information, please contact

Email: dccleanrivers@dcwater.com

24/7 NEBT Hotline: (800) 988-6151

Northeast Boundary Tunnel Project Website: dcwater.com/NEBT

Latest News

Photo of West Road where construction will take place

Beginning the week of April 21, 2025, DC Water will implement temporary traffic lane closures near Georgetown University’s Canal Road Northwest entrance to identify and mark underground utilities for ...

Map of Clara Barton Parkway near 495 with lane closures marked and site of incident damage

DC Water and its engineers will conduct an emergency inspection of a 78-inch sewer pipe located next to the Clara Barton Parkway. This follows an incident where a contractor working in the area ...

Picture inside Washington Aqueduct of pipes and tanks

It’s that time of year, when you start your spring cleaning and DC Water does too! Beginning on March 24 through May 4, we’ll be disinfecting our 1300 miles of water lines. It’s part of routine ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of West Road where construction will take place
TRAFFIC ADVISORY: Canal Road NW Entrance to Georgetown University

Beginning the week of April 21, 2025, DC Water will implement temporary traffic lane closures near Georgetown University

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
April 22, 2025
Tuesday, 9:30 AM