SMALL DIAMETER WATER MAIN REPLACEMENT PROJECT ADAMS MORGAN NEIGHBORHOOD– ADVISORY NEIGHBORHOOD COMMISSION 1C

 DC Water is replacing

OVERVIEW 

As part of its Capital Improvement Program, DC Water is replacing existing 12-inch and smaller cast iron water mains in various locations throughout the city. Construction for this project will occur in the Adams Morgan neighborhood (see construction location map on back). These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system.

SCOPE OF WORK

  •  Installation of approximately 3,455 linear feet of 4-inch up to 12-inch water mains
  • Replacement of service lines – including free private side replacement of lead and galvanized iron pipe 
  • Replacement of fire hydrants and valves • Restoration of all surfaces disturbed by the project construction upon completion of the work

SCHEDULE 

  • Construction start: On or about 03/21/2022 
  • Construction completion: On or about 03/31/2024 
  • Normal work hours: 9:30 AM to 3:30 PM, Monday through Friday The contractor may, at times, need to work at night or on weekends, dependent upon certain construction activities, or due to inclement weather.

IMPORTANT INFORMATION

  • If a planned temporary water service shut-off is necessary, affected residents will be notified 48 hours in advance. Service interruptions will be minimal. 
  • Construction may cause temporary discolored water or low water pressure. If you experience discolored water, flush cold water taps for 15 minutes. If water does not clear, contact the DC Water Drinking Water Division or 24-hr Emergency/Command Center.

TRAFFIC

  • Lane closures may be required daily with approved traffic plans by the District Department of Transportation (DDOT). 
  • Notifications regarding “No-Parking” zones will be posted 72 hours prior to construction, in certain areas in and around the job site, as required by DDOT.

PARTNERS

DC Water is currently working closely with DDOT to ensure minimal disruption during this project.

Regular updates will also be provided to impacted residents, Advisory Neighborhood

Commission 1C, Ward 1 representatives in the Mayor’s Office of Community Relations and Services,

and Ward 1 Councilmember Brianne Nadeau and members of her staff. 

 

 

Contact Information

for more information, please contact

DC Water Project Manager: Wisal Khan (202) 787-7575 / wisal.khan@dcwater.com

DC Water Construction Manager: David Campbell (703) 628-7067 / david.campbell@dcwater.com

DC Water Project Contractor: Capitol Paving – Reyes Fuentes (202) 438-6912

DC Water Office of Water Quality and Technology: (202) 612-3440

DC Water 24-hr Emergency/Command Center: (202) 612-3400

DC Water Office of Marketing and Communications: (202) 787-2200