Right of Entry Authorization Form

Lead Free DC is working to replace all lead service lines throughout the District. To sign up for a free lead service line replacement when DC Water is replacing lead service lines on your block, you must sign a Right of Entry Authorization Form (ROE Form). This form gives permission for DC Water and its contractors to replace the lead service line on your private property. This ROE form must be signed and submitted by the property owner or authorized person. The Authorized Person (resident or other party) must submit a notarized letter from the property owner or other legal documentation authorizing them to represent the owner.

Follow this guide to fill out your ROE form using DocuSign.

Sign your ROE form online using DocuSign.

Review this guide to understand what the contractor will do in 4 steps.

If you need assistance or have questions about filling out the authorization form, please email lead@dcwater.com or call (202) 787-4044.

Need help in another language? 

Translated ROE forms are available in Amharic, Chinese (Simplified and Traditional), French, Korean, Spanish, and Vietnamese below.

  1. Select your preferred language and download the form.
    1. Amharic
    2. Chinese (Simplified)
    3. Chinese (Traditional)
    4. French
    5. Korean
    6. Spanish
    7. Vietnamese
  2. After filling it out and signing, you can submit it by:
    1. Emailing it to lead@dcwater.com
    2. Mailing it to 5000 Overlook Avenue, SW, COF Bldg., 5th Floor, Washington, DC 20032.
       

If you need help accessing, completing, or submitting the form, please don’t hesitate to contact us at lead@dcwater.com or 202-787-4044. We're here to help.

I've signed my ROE form. What's Next?

After you've signed and submitted your ROE form to DC Water, a contractor will contact you to schedule your lead service line replacement once construction is getting ready to start on your block. 

  • See when construction is scheduled for your block by searching your address on our Construction Dashboard.
  • Learn what to expect for your service line replacement by watching this video!
  • Learn about filtering your water to remove lead here.

Have questions? Contact us at lead@dcwater.com or 202-787-4044.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Last gantry at the bottom of the shaft where crews connect it
Now Fully Assembled, It’s Full Speed Ahead for the tunnel boring machine Mary and the Potomac River Tunnel

Final Gantry Completes Mobile Support Train Behind Mary Stretching More Than 700 Feet

DC Water’s tunnel boring machine Mary may be the muscle behind the Potomac River Tunnel Project, but the gantries that trail behind her form the heart, brains, and guts of the operation. Now crews have lowered and connected the final gantry section, giving Mary the tools and equipment she needs to continue tunneling north.

Latest Blog Post
Emergency supplies arranged on a table, including bottled water, canned food, a backpack, first aid kit, flashlight, phone, medication and other essential items.
Simple Ways to Stay Prepared at Home
A few simple steps can help your household prepare for severe weather and temporary water or sewer service interruptions.
Upcoming Meeting

Upcoming Events

Sep 6
Sep 19

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.