![contract for construction of the Potomac River Tunnel (PRT)](/sites/default/files/2023-10/dc-water-border.png)
21 July, 2011
Industry Association Recognizes Plant for Sixth Consecutive Year
![contract for construction of the Potomac River Tunnel (PRT)](/sites/default/files/2023-10/dc-water-border.png)
11 July, 2011
Repair Work Will Take Place Between Brandywine Street and Ridge Road
![contract for construction of the Potomac River Tunnel (PRT)](/sites/default/files/2023-10/dc-water-border.png)
21 June, 2011
2010 Drinking Water Quality Report Published
![contract for construction of the Potomac River Tunnel (PRT)](/sites/default/files/2023-10/dc-water-border.png)
1 June, 2011
TapIt network of refillable water bottle locations spans 22 states and DC
![contract for construction of the Potomac River Tunnel (PRT)](/sites/default/files/2023-10/dc-water-border.png)
23 May, 2011
Residents urged to find other ways to beat the heat as temperatures rise
![contract for construction of the Potomac River Tunnel (PRT)](/sites/default/files/2023-10/dc-water-border.png)
17 May, 2011
Mayor Gray, Dignitaries, Usher in New Era of Technology: One project turns waste into power; the other reduces nitrogen to protect Chesapeake Bay