Do not flush paper towels, wipes or facial tissues—they clog your pipes and our pumps!

March 27, 2020
Don't flush wipes image

As toilet paper is now so hard to find, many District residents and employees are turning to alternatives. If you must use something other than toilet paper, please be sure to discard it in the trash.

Only toilet paper is designed to break apart in pipes and sewers. Toilet paper goes through extensive testing to ensure that it disintegrates as it is flushed, other products remain intact and obstruct pipes.

Don’t be fooled by wipes packaging claims that these products are flushable. They are not. These and other alternatives may make it down your toilet, but they cause a number of problems on their journey to the wastewater treatment plant. They can, and do, clog pipes causing backups in homes and neighborhoods. Wipes, and other tp alternatives, form giant globs that tangle and damage DC Water’s sewer pumps.

“We know these are trying times,” said DC Water CEO and General Manager David L. Gadis. “But one simple action – to throw these items in the trash rather than flushing them – can save you from even further disruption—and plumber’s fees. Water and sewer services are critical in solving this current health crisis. Please protect our systems and your health.”

More information on protecting your pipes can be found at protectyourpipes.org/

Wipes stuck in equipment at DC Water's Potomac Sewer Pumping Station.

 

Latest News

Picture of repaired segment before the geopolymer work and after the work is done

Crews also reach a major milestone near Dulles International Airport as the next phase of repairs begins this week

DC Water has completed the first major step in emergency repairs to a 175-foot section of the Potomac Interceptor near Pennyfield Lock in Potomac, Maryland. Crews added a new, stronger lining inside the pipe after inspections found serious wear and damage. The work is part of ongoing repairs to 1,700 linear feet of pipe near Pennyfield Lock. Work began on Friday to apply geopolymer, a concrete-like material, inside the pipe. With the new lining complete, crews are preparing for the next phase of work for the remainder of the pipe segment.

image of clara barton parkway with lane closure marked in red

Beginning this week and continuing through mid-August, DC Water will temporarily close one lane overnight on Clara Barton Parkway at the Maryland-D.C. border. The closures are needed so crews can ...

Pennyfield Lock Potomac Interceptor bypass pipeline running next to C & O Canal with equipment

There is no active spill or overflow. Work to strengthen the pipe to begin soon.

Today, DC Water completed construction on a temporary bypass system as part of sewer repairs on the Potomac Interceptor near Pennyfield Lock in Potomac, Maryland. Crews turned on the pumps and successfully tested the system. With the bypass now ready, it will allow us to begin the emergency repairs inside the pipe by carrying the wastewater around the repair area.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

DC Water Officials with NPS and ANC commissioners doing ceremonial groundbreaking
DC Water Breaks Ground on Piney Branch Tunnel, Final Phase of DC Clean Rivers Project

Today, DC Water broke ground on the Piney Branch Tunnel, the final major tunnel in our Clean Rivers Project. This work will help keep sewage and trash out of local waterways and make Rock Creek, the Potomac River, and the Chesapeake Bay cleaner for our community.

When we finish the Piney Branch Tunnel, it will hold at least 4.2 million gallons of rainwater and wastewater during heavy storms. Instead of overflowing into Piney Branch, that water will go to the Blue Plains Water Resource Recovery Facility, where it will be treated.

Latest Blog Post
Plastic bottles, cups and other floating debris on the surface of the Anacostia River before the Anacostia River Tunnel began operating.
Cleaner Waterways Start With Everyday Choices
Protecting our waterways starts with everyday actions and continues through critical infrastructure designed to keep pollution out of our rivers.
Upcoming Meeting

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.